[{"command":"insert","method":"replaceWith","selector":"#div_procedure","data":"\u003Cdiv id=\u0022div_procedure\u0022\u003E\n \u003Ch3\u003EChange-in-use\/Moves And\/Or Renovation\/Remodeling Project\u003C\/h3\u003E\n \u003Cdiv class=\u0022text-card\u0022\u003E\n \u003C!-- \u003Cp class=\u0022h5\u0022\u003EProcedure\u003C\/p\u003E --\u003E\n \u003Cdiv\u003E\u003Cp\u003EWhereas a university department plans to make a change in the department\u0026#39;s use of physical plant facilities (this includes room changes, renovating existing facilities or the installation\/modification of equipment which requires changes to building systems) the department must:\u003C\/p\u003E\r\n\r\n\u003Cp\u003ESubmit a \u003Ca href=\u0022http:\/\/nmu.edu\/facilities\/about-nmu-engineering-and-planning#change\u0022\u003E\u0026quot;Change-in-Use\u0026quot; form\u003C\/a\u003E\u0026nbsp;to The Engineering and Planning Department.\u003Cbr \/\u003E\r\nThis requires the requesting department\u0026#39;s division head approval.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EEngineering and Planning Reviews the \u0026quot;Change-in-Use\u0026quot; form and:\u003C\/p\u003E\r\n\r\n\u003Cul\u003E\r\n\t\u003Cli\u003EIdentifies Building Modifications\u003C\/li\u003E\r\n\t\u003Cli\u003EUpdates Facilities Database\u003C\/li\u003E\r\n\t\u003Cli\u003EInforms Master Plan Committee of any changes in use of facility to ensure compliance with the Master Plan\u003C\/li\u003E\r\n\u003C\/ul\u003E\r\n\r\n\u003Cp\u003EIf plan does not require any building modifications, and is consistent with the University Master Plan and applicable codes, Engineering and Planning will notify the department to proceed and the following steps do not apply.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EIf required, Engineering and Planning will develop a cost estimate for building modifications.\u003C\/p\u003E\r\n\r\n\u003Cp\u003ERequesting department identifies funding source.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EEngineering and Planning develops specifications and plans and coordinates all necessary code reviews.\u003C\/p\u003E\r\n\r\n\u003Cp\u003EProject turned over to Plant Operations for completion or to Purchasing\u0026nbsp;for contractor bids.\u003C\/p\u003E\r\n\r\n\u003Cp\u003E\u0026nbsp;\u003C\/p\u003E\r\n\u003C\/div\u003E\n \u003C\/div\u003E\n\u003C\/div\u003E\n","settings":null},{"command":"redirect","url":"#procedure_anchor"}]